Divine Savior School

The Project consisted of providing a design that incorporates a wheelchair access lift from the entry grade to the lower level church and upper level parish hall.  In concept, the lift would be installed within the area of the existing planter at the entrance to the church.  It would travel down to the church level and up to a new landing at the elevation of the parish hall. Plan modifications on the lower level included eliminating the existing single user toilet room to create a vestibule for the lift and designing a new code compliant restroom. 

Project Cost: $100,000
Site Location: Norridge, IL
Completion Date: 2007